After the successful installation of the WaveEL buoy on site at Runde, the launch of the remaining system has been temporarily halted at midnight Friday, due to a problem with the connection hub, which was damaged during a corrective action with a misplaced mooring line.
The Olympic Zeus had to leave for an operation in Africa early Saturday morning so the launch operation can not resume until her return. In the mean time we will investigate the cause of the damage and corrective actions will be taken to have the hub ready for launch upon Zeus return.